Items where Cluster is "Engineering" and Year is 2000

[Atom feed] Atom [RSS2 feed] RSS
[BatchList tool] Batch List
Group by: Creators | Item Type | No Grouping
Jump to: E | H | L | M | N | P | W
Number of items: 22.

E

Edwards, David J. and Holt, Gary David (2000) ESTIVATE: a model for calculating excavator productivity and output costs. Engineering, Construction and Architectural Management, 7 (1). pp. 52-62. ISSN 0969-9988

Edwards, David J., Holt, Gary David and Harris, Frank C. (2000) Estimating life cycle plant maintenance costs. Construction Management and Economics, 18 (4). pp. 427-435. ISSN 0144-6193

Edwards, David J., Holt, Gary David and Harris, Frank C. (2000) A comparative analysis between the multilayer perceptron “neural network” and multiple regression analysis for predicting construction plant maintenance costs. Journal of Quality in Maintenance Engineering, 6 (1). pp. 45-61. ISSN 1355-2511

Edwards, David J., Holt, Gary David and Spreckley, J. (2000) Application of the Multilayer Perceptron Neural Network for Predicting Plant Downtime Costs. The Journal of Computer Integrated Design and Construction, 2 (3). pp. 183-192.

H

Holt, Gary David and Faniran, O. (2000) Construction Management Research: A Blend of Rationalist and Interpretative Paradigms. The Journal of Construction Research, 1 (2). pp. 177-182. ISSN 1609-9451

Holt, Gary David, Love, Peter E.D. and Li, Heng (2000) The learning organisation: toward a paradigm for mutually beneficial strategic construction alliances. International Journal of Project Management, 18 (6). pp. 415-421. ISSN 02637863

Holt, Gary David, Love, Peter E.D. and Nesan, L. Jawahar (2000) Employee empowerment in construction: an implementation model for process improvement. Team Performance Management, 6 (3/4). pp. 47-51. ISSN 1352-7592

Holt, Gary David, Proverbs, D. and Whitehouse, L. (2000) A Survey of Public Sector Procurement in England. The Journal of Construction Procurement, 7 (1). pp. 3-10. ISSN 1358-9180

L

Love, Peter E.D. and Holt, Gary David (2000) Construction business performance measurement: the SPM alternative. Business Process Management Journal, 6 (5). pp. 408-416. ISSN 1463-7154

Love, Peter E.D., Li, Heng, Irani, Zahir and Holt, Gary David (2000) Re-thinking TQM: toward a framework for facilitating learning and change in construction organizations. The TQM Magazine, 12 (2). pp. 107-117. ISSN 0954-478X

M

Mbugua, L., Holt, Gary David and Olomolaiye, P. (2000) Evaluation of Self-Assessment Frameworks for Business Self-Assessment and their Application to UK Construction. Journal of Financial Management of Property and Construction, 5 (3). pp. 135-148. ISSN 1366-4387

N

NICHOLAS, J., Holt, Gary David and MIHSEIN, M. (2000) Forecasting construction materials suppliers' financial turnover. Engineering, Construction and Architectural Management, 7 (3). pp. 221-231. ISSN 0969-9988

Nicholas, J, Holt, Gary David and Love, P.E.D (2000) Impacts of credit control and debt collection procedures upon suppliers’ turnover. European Journal of Purchasing & Supply Management, 6 (3-4). pp. 237-243. ISSN 09697012

Nicholas, J., Holt, Gary David and Harris, P. (2000) An Investigation into Predicting Materials Suppliers' Profit Margins. The Journal of Construction Procurement, 6 (2). pp. 231-245. ISSN 1358-9180

Nicholas, J., Holt, Gary David and Harris, P. T. (2000) Suppliers' debt collection and contractor creditworthiness evaluation. Building Research & Information, 28 (4). pp. 268-279. ISSN 0961-3218

Nicholas, J., Holt, Gary David and Mihsein, M. (2000) Contractor financial credit limits; their derivation and implications for materials suppliers. Construction Management and Economics, 18 (5). pp. 535-545. ISSN 0144-6193

Nicholas, J., Holt, Gary David and Mihsein, M. (2000) Predicting Materials Suppliers' Bad Debt. Journal of Construction Research (jcr), 1 (2). pp. 159-168. ISSN 1609-9451

Nicholas,, J., Holt, Gary David and Harris, P. (2000) Materials Suppliers: The Builders' Banker? Journal of Financial Management of Property and Construction, 4 (3). pp. 29-38. ISSN 1366-4387

P

Proverbs, D. G. and Holt, Gary David (2000) A theoretical model for optimum project (time) performance based on European best practice. Construction Management and Economics, 18 (6). pp. 657-665. ISSN 0144-6193

Proverbs, D., Nicholas, J. and Holt, Gary David (2000) Surveying Flood Damage to Domestic Dwellings: The Present State of Knowledge. RICS Research Foundation Series, 3 (8).

Proverbs, David G and Holt, Gary David (2000) Reducing construction costs: European best practice supply chain implications. European Journal of Purchasing & Supply Management, 6 (3-4). pp. 149-158. ISSN 09697012

W

Wong, Chee H., Holt, Gary David and Cooper, Patricia A. (2000) Lowest price or value? Investigation of UK construction clients' tender selection process. Construction Management and Economics, 18 (7). pp. 767-774. ISSN 0144-6193

This list was generated on Wed Dec 25 21:30:31 2024 UTC.