Edwards, David J., Holt, Gary David and Harris, Frank C. (2002) Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry. Construction Management and Economics, 20 (7). pp. 581-591. ISSN 0144-6193
Edwards, David J., Holt, Gary David and Robinson, Barry (2002) An artificial intelligence approach for improving plant operator maintenance proficiency. Journal of Quality in Maintenance Engineering, 8 (3). pp. 239-252. ISSN 1355-2511
Kirkup, Stephen Martin ORCID: 0000-0002-9680-7778 and Wadsworth, M. (2002) Solution of inverse diffusion problems by operator-splitting methods. Applied Mathematical Modelling, 26 (10). pp. 1003-1018. ISSN 0307904X
LOVE, PETER E. D., Tse,, R.Y., Holt, Gary David and Proverbs, D (2002) Transaction Costs, Learning and Alliances in Construction. Journal of Construction Research, 3 (2). p. 193. ISSN 16099451
LOVE, PETER E.D., Holt, Gary David and LI, HENG (2002) Triangulation in construction management research. Engineering, Construction and Architectural Management, 9 (4). pp. 294-303. ISSN 0969-9988
Love, P.E.D., Holt, Gary David, Shen, L.Y., Li, H. and Irani, Z. (2002) Using systems dynamics to better understand change and rework in construction project management systems. International Journal of Project Management, 20 (6). pp. 425-436. ISSN 02637863
Mariani, A.J, Kirkup, Stephen Martin ORCID: 0000-0002-9680-7778, Huang, Y and Jones, G.R (2002) On coupling electromagnetic fields and lumped circuits with TLM. Applied Mathematical Modelling, 26 (3). pp. 377-396. ISSN 0307904X
Nesan, L. Jawahar and Holt, Gary David (2002) Assessment of organisational involvement in implementing empowerment. Integrated Manufacturing Systems, 13 (4). pp. 201-211. ISSN 0957-6061