Welcome to

CLoK

Image Credit Header image: Artwork by Professor Lubaina Himid, CBE. Photo: @Denise Swanson


Browse by Publisher

[Atom feed] Atom [RSS2 feed] RSS
[BatchList tool] Batch List
Number of items: 14.

Nesan, L. Jawahar and Holt, Gary David (2002) Assessment of organisational involvement in implementing empowerment. Integrated Manufacturing Systems, 13 (4). pp. 201-211. ISSN 0957-6061

LOVE, PETER E.D., Holt, Gary David and LI, HENG (2002) Triangulation in construction management research. Engineering, Construction and Architectural Management, 9 (4). pp. 294-303. ISSN 0969-9988

Edwards, David J., Holt, Gary David and Robinson, Barry (2002) An artificial intelligence approach for improving plant operator maintenance proficiency. Journal of Quality in Maintenance Engineering, 8 (3). pp. 239-252. ISSN 1355-2511

Soetanto, Robby, Proverbs, David G. and Holt, Gary David (2001) Achieving quality construction projects based on harmonious working relationships - Clients’ and architects’ perceptions of contractor performance. International Journal of Quality & Reliability Management, 18 (5). pp. 528-548. ISSN 0265-671X

SÖNMEZ, M., YANG, J.B. and Holt, Gary David (2001) Addressing the contractor selection problem using an evidential reasoning approach. Engineering, Construction and Architectural Management, 8 (3). pp. 198-210. ISSN 0969-9988

WONG, CHEE H., Holt, Gary David and HARRIS, PHIL (2001) Multi-criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences. Engineering, Construction and Architectural Management, 8 (4). pp. 257-271. ISSN 0969-9988

Stanley, Nicky orcid iconORCID: 0000-0002-7644-1625 (2001) Reforming the Mental Health Act - Editorial Policy Comment. Journal of Adult Protection, 3 (3). pp. 2-5. ISSN 1466-8203

Nicholas, J., Holt, Gary David and Proverbs, D.G. (2001) Towards standardising the assessment of flood damaged properties in the UK. Structural Survey, 19 (4). pp. 163-172. ISSN 0263-080X

Love, Peter E.D. and Holt, Gary David (2000) Construction business performance measurement: the SPM alternative. Business Process Management Journal, 6 (5). pp. 408-416. ISSN 1463-7154

Edwards, David J. and Holt, Gary David (2000) ESTIVATE: a model for calculating excavator productivity and output costs. Engineering, Construction and Architectural Management, 7 (1). pp. 52-62. ISSN 0969-9988

Holt, Gary David, Love, Peter E.D. and Nesan, L. Jawahar (2000) Employee empowerment in construction: an implementation model for process improvement. Team Performance Management, 6 (3/4). pp. 47-51. ISSN 1352-7592

NICHOLAS, J., Holt, Gary David and MIHSEIN, M. (2000) Forecasting construction materials suppliers' financial turnover. Engineering, Construction and Architectural Management, 7 (3). pp. 221-231. ISSN 0969-9988

Love, Peter E.D., Li, Heng, Irani, Zahir and Holt, Gary David (2000) Re-thinking TQM: toward a framework for facilitating learning and change in construction organizations. The TQM Magazine, 12 (2). pp. 107-117. ISSN 0954-478X

Edwards, David J., Holt, Gary David and Harris, Frank C. (2000) A comparative analysis between the multilayer perceptron “neural network” and multiple regression analysis for predicting construction plant maintenance costs. Journal of Quality in Maintenance Engineering, 6 (1). pp. 45-61. ISSN 1355-2511

This list was generated on Tue Sep 19 01:53:19 2023 UTC.